enLanguage
Home > News > Content

Industrial Furnace Needs To Be Cleaned In Time After It Is Running

May 22, 2019

In order to ensure that the boiler water quality meets the standard, the hot water heating boiler runs without scale or thin scale, without serious corrosion, avoiding or reducing boiler accidents, prolonging the service life of the boiler, and doing the following work in operation management.

(1) The heating pipe network is strictly purged before being put into operation. Pipe flushing scheme, if flushed with clean water, the flow rate of water should be no less than 1.5m / s, until the water is discharged from the pipe to completely remove the debris in the pipe.

(2) The leader of the furnace unit should strengthen the study of boiler water treatment knowledge, master the basic knowledge of boiler operation water treatment, and pay attention to the management, supervision and assessment of water treatment work.

(3) After the boiler is put into operation, it is necessary to periodically stop the furnace to check the scaling and timely remove the scale. Technicians and water treatment personnel should understand the situation of boiler fouling and carry out laboratory analysis on scale samples in order to take corresponding measures for treatment.

(4) Replace the aging resin and the equipment with poor treatment effect in time, and use the softened hydrated salt in the boiler room treated with sodium ion exchanger for water treatment. If the water treatment effect is not good, If the water quality is not up to standard, the water treatment operator should promptly identify the cause, report it in time, and take measures to ensure that the water quality meets the standard.

(5) In addition to the training and assessment of the labor department, the furnace unit shall regularly conduct theoretical knowledge, skill operation training and safety awareness education for the water quality laboratory personnel, and conduct a rigorous assessment. After the assessment, the water quality laboratory inspection personnel shall be issued and certified. Worked on the job and strive to ensure the stability, operational capability and management level of water quality testers continue to improve.

(6) Improve and strictly implement the responsibility system for boiler water treatment posts. Formulate the operating procedures suitable for the water treatment equipment of the boiler room, and deal with the water quality testers who are not responsible, work seriously, and falsified.

(7) Implement boiler water quality monitoring system. The competent department of water quality of the upper boiler shall regularly monitor the boiler feed water and furnace water, improve the water quality management level for the furnace unit, and adjust the test for the new installation and renovation of the boiler water treatment facility.


Hangzhou Hangshen Energy-Saving Furnace Co.,Ltd.

Sales manager: Mr.Qian

Tel: 0086-571-86172088

Fax: 0086-571-86173266

Mobile phone: 15990123123

Website:www.cnsuntech.com

Email: hsdl088@126.com


Send Inquiry